Foundation preparation on a ShellCo project
03Our work

Real construction stages. Clearly shown.

A working record of ShellCo foundations, structures, floors, extensions and external works. Project facts are kept factual until fuller case-study information is available.

01Project record

Work across the structure and the external finish.

The gallery shows genuine project photography without stock imagery or unsupported outcomes.

Timber foundation formwork on a ShellCo project
01 / Groundworks

Foundation preparation

Formwork and the site sequence prepared for the concrete foundation stage.

Structural steel frame in progress on a ShellCo project
02 / Structural shell

Steel frame in progress

Structural steel erected as part of the developing building shell.

Completed rear extension built by ShellCo
03 / Extension

Completed rear extension

A finished extension with the structure, roof and external openings complete.

Concrete foundation stage completed by ShellCo
04 / Foundations

Concrete foundation stage

Concrete placed and prepared for the building stages that follow.

Smooth finished floor screed completed by ShellCo
05 / Floor systems

Finished floor screed

A completed screed stage leaving the internal floor ready to progress.

Completed resinbound driveway by ShellCo
06 / External works

Resinbound driveway

Prepared levels, contrasting edges and a completed resinbound surface.

Stone patio completed by ShellCo
07 / External works

Stone patio

A completed paved area formed around the existing property and access.

Brick boundary wall completed by ShellCo
08 / Brickwork

Boundary wall

A completed brick boundary wall with consistent line and finish.

Paved driveway completed by ShellCo
09 / External works

Paved driveway

A finished driveway with defined entrance, levels and practical access.